Project 2: Project Rivers

Project 2: Project Rivers

  General Information

Lead Teacher(s): Judy Benson - French Department Head
(jbenson@calvin.stemnet.nf.ca)

Gary White - Teacher-Librarian
(gwhite@calvin.stemnet.nf.ca)

School: Frank Roberts Intermediate
P.O. Box 203
Foxtrap, NF
A0A 2J0
Tel: (709) 834-8002
Grade Level: Grade 9
Number of Students: 33
Project Start and Finish Dates: September,1998 - December, 1998

  Project Overview

Our school would like to become part of this already existing STELLAR school project.

As part of the Science program students from a Grade Nine French Immersion classes would determine the water quality of a very small stream that runs in very close proximity to our school. By using several biological indicators such as type and absence of flora and fauna of the brook, students will try to determine the water quality. Along with these indicators, students will measure the pH levels, oxygen content, temperature of the test area, and phosphate presence. Working in groups the students would then post the information collected to the existing database and make comparisons. In addition, the information would be posted to our school’s home page so that students doing this project in successive years could compare the data from previous years drawing conclusions about changes to the quality of water in this stream.

It is proposed that this project start in September of next year since students have already completed the unit of work in the Science program.

  Curriculum Connections

3.1 Main Curriculum Areas Relating to the Project:

____________ _____________ ______________

3.2 In column one list one or more appropriate Department of Education Learning Outcomes. In column two describe how the outcomes of your project fulfill the curriculum requirements.

Department of Education Learning Outcomes Project Links
1. 1.
2. 2.
3. 3.
4. 4.

3.3 In column one list the appropriate Department of Education Technology Education Outcomes. In column two describe how the outcomes of your project satisfy the curriculum requirements.

Technology Education Learning Outcomes Project Links
1. 1.
2. 2.
3. 3.
4. 4.

  Resource Connections

4.1 Explain how a high-speed STELLAR school connection will enable or enhance this project.

 

4.2 List other resources required for the success of this project.

 

  Evaluation

5.1 Develop a time line to indicate when you expect students to achieve the intended learning outcomes or accomplish milestones that indicate substantial progress.

Expected Date

Outcome or Milestone

Date
Achieved

     
     
     
     
     
     

5.2 Discuss how this project provides an opportunity for students to communicate with others (e.g. e-mail, newsgroups, web pages and electronic presentations that include text and/or multimedia.

 

5.3 Explain how students will acknowledge all sources of information (web sites, print sources, software, media reports, etc.)

 

STELLAR Schools footer
home Previous Page